Friedman Edge Reading Room · 2024 GA IPC

Appendix A Plumbing Permit Fee Schedule

State amendments integrated3 filed sections2024 editionEffective January 1, 2026
Browse this code

Appendix A Plumbing Permit Fee Schedule

The provisions contained in this appendix are not mandatory unless specifically referenced in the adopting ordinance.

Section A101 Plumbing Permit Fee Schedule

A101.1 General.

See Table A101.1 for an example plumbing permit fee schedule.

TABLE A101.1 EXAMPLE OF PERMIT FEE SCHEDULE

Permit Issuance

1.

For issuing each permit

$______

2.

For issuing each supplemental permit

_______

Unit Fee Schedule

1.

For each plumbing fixture or trap or set of fixtures on one trap (including water, drainage piping and backflow protection thereof)

_______

2.

For each building sewer and each trailer park sewer

_______

3.

Rainwater systems—per drain (inside building)

_______

4.

For each cesspool (where permitted)

_______

5.

For each private sewage disposal system

_______

6.

For each water heater and/or vent

_______

7.

For each industrial waste pretreatment interceptor including its trap and vent, excepting kitchen-type grease interceptors functioning as fixture traps

_______

8.

For installation, alteration or repair of water-piping and/or water-treating equipment, each

_______

9.

For repair or alteration of drainage or vent piping, each fixture

_______

10.

For each lawn sprinkler system on any one meter including backflow protection devices therefor

_______

11.

For atmospheric-type vacuum breakers not included in Item 2:

1 to 5

_______

over 5, each

_______

12.

For each backflow protective device other than atmospheric-type vacuum breakers:

2 inches (51 mm) and smaller

_______

Over 2 inches (51 mm)

_______

Other Inspections and Fees

1.

Inspections outside of normal business hours (minimum charge 2 hours)

_____ per hour

2.

Reinspection fee assessed under provisions of Section 111.4.3

_____ each

3.

Inspections for which no fee is specifically indicated (minimum charge one-half hour)

_____ per hour

4.

Additional plan review required by changes, additions or revisions to approved plans (minimum charge one-half hour)

_____ per hour

Source and transcript record

Record Georgia · 2024 IPC · Appendix A Plumbing Permit Fee Schedule

Effective January 1, 2026 · source captured Aug 30, 2026

Transcript SHA-256 9150d59a5684d3d9d591643fce6e407185836aaaf470be60ace4b22c455e4a8e · text SHA-256 0b39999233dbb1e2cd97e6cb159eaa6682ad128e38ea26bb65b6598ea682a56a

Adoption authority · Official amendments · ICC chapter source