Section 1301 General

1301.1 Scope.

This chapter shall govern the design, installation, construction and repair of fuel oil storage and piping systems. The storage of fuel oil and flammable and combustible liquids shall be in accordance with Chapters 6 and 57 of the International Fire Code. The State's minimum requirements for fuel oil piping and storage shall be as established by the Georgia State Minimum Fire Safety Standards and the as adopted and amended Rules and Regulations of the Georgia Insurance and Safety Fire Commissioner. Any areas not addressed by the Georgia State Minimum Fire Safety Standards shall be regulated by this chapter.

1301.2 Storage and piping systems.

Fuel oil storage systems shall comply with Section 605.4 of the International Fire Code. Fuel oil piping systems shall comply with the requirements of this code.

1301.3 Fuel type.

An appliance shall be designed for use with the type of fuel to which it will be connected. Such appliance shall not be converted from the fuel specified on the rating plate for use with a different fuel without securing reapproval from the code official.

1301.4 Fuel tanks, piping, fittings and valves.

The tank, piping, fittings and valves for appliances burning oil shall be installed in accordance with the requirements of this chapter. Where an oil burner is served by a tank, any part of which is above the level of the burner inlet connection and where the fuel supply line is taken from the top of the tank, an approved antisiphon valve or other siphon-breaking device shall be installed in lieu of the shutoff valve.

1301.5 Tanks abandoned or removed.

All exterior above-grade fill piping shall be removed when tanks are abandoned or removed. Tank abandonment and removal shall be in accordance with Section 5704.2.13 of the International Fire Code.

Section 1302 Material

1302.1 General.

Piping materials shall conform to the standards cited in this section.

1302.2 Rated for system.

All materials shall be rated for the operating temperatures and pressures of the system, and shall be compatible with the type of liquid.

1302.3 Pipe standards.

Fuel oil pipe shall comply with one of the standards listed in Table 1302.3.

TABLE 1302.3 FUEL OIL PIPING AND FITTINGS

MATERIAL

STANDARD (see Chapter 15)

Copper or copper-alloy pipe and fittings

ASTM B42; ASTM B43; ASTM B302; ASTM F3226

Copper or copper-alloy tubing and fittings (Type K, L or M)

ASME B16.51; ASTM B75; ASTM B88; ASTM B280; ASTM F3226

Labeled pipe

(See Section 1302.4)

Nonmetallic pipe

ASTM D2996

Steel and stainless steel pipe and fittings

ASTM A53; ASTM A106; ASTM A312/A312M; ASTM F3226

Steel and stainless steel tubing and fittings

ASTM A254; ASTM A269/A269M; ASTM A539; ASTM F3226

1302.4 Nonmetallic pipe.

Nonmetallic pipe shall be listed and labeled as being acceptable for the intended application for flammable and combustible liquids. Nonmetallic pipe shall be installed only outdoors, underground.

1302.5 Fittings and valves.

Fittings and valves shall be approved for the piping systems, and shall be compatible with, or shall be of the same material as, the pipe or tubing.

1302.6 Bending of pipe.

Pipe shall be approved for bending. Pipe bends shall be made with approved equipment. The bend shall not exceed the structural limitations of the pipe.

1302.7 Pumps.

Pumps that are not part of an appliance shall be of a positive-displacement type. The pump shall automatically shut off the supply when not in operation. Pumps shall be listed and labeled in accordance with UL 343.

1302.8 Flexible connectors and hoses.

Flexible connectors and hoses shall be listed and labeled as being acceptable for the intended application for flammable and combustible liquids.

1302.9 Piping systems.

Above-ground piping systems shall be listed and labeled in accordance with UL 1369. Underground piping systems shall be listed and labeled in accordance with UL 971A.

Section 1303 Joints and Connections

1303.1 Approval.

Joints and connections shall be approved and of a type approved for fuel oil piping systems. Threaded joints and connections shall be made tight with suitable lubricant or pipe compound. Unions requiring gaskets or packings, right or left couplings, and sweat fittings employing solder having a melting point of less than 1,000°F (538°C) shall not be used in oil lines. Cast-iron fittings shall not be used. Joints and connections shall be tight for the pressure required by test.

1303.1.1 Joints between different piping materials.

Joints between different piping materials shall be made with approved adapter fittings. Joints between different metallic piping materials shall be made with approved dielectric fittings or copper-alloy converter fittings.

1303.2 Preparation of pipe ends.

Pipe shall be cut square, reamed and chamfered and be free from all burrs and obstructions. Pipe ends shall have full-bore openings and shall not be undercut.

1303.3 Joint preparation and installation.

Where required by Sections 1303.4 through 1303.9, the preparation and installation of brazed, mechanical, threaded, press-connect and welded joints shall comply with Sections 1303.3.1 through 1303.3.5.

1303.3.1 Brazed joints.

All joint surfaces shall be cleaned. An approved flux shall be applied where required. The joints shall be brazed with a filler metal conforming to AWS A5.8M/A5.8.

1303.3.2 Mechanical joints.

Mechanical joints shall be installed in accordance with the manufacturer’s instructions.

1303.3.3 Threaded joints.

Threads shall conform to ASME B1.20.1. Pipe-joint compound or tape shall be applied on the male threads only.

1303.3.4 Welded joints.

All joint surfaces shall be cleaned by an approved procedure. The joint shall be welded with an approved filler metal.

1303.3.5 Press-connect joints.

Press-connect joints shall be installed in accordance with the manufacturer’s instructions and shall conform to one of the standards listed in Table 1302.3.

1303.4 Copper or copper-alloy pipe.

Joints between copper or copper-alloy pipe or fittings shall be brazed, mechanical, threaded, press-connect or welded joints complying with Section 1303.3.

1303.5 Copper or copper-alloy tubing.

Joints between copper or copper-alloy tubing or fittings shall be brazed, mechanical or press-connect joints complying with Section 1303.3.

1303.6 Nonmetallic pipe.

Joints between nonmetallic pipe or fittings shall be installed in accordance with the manufacturer’s instructions for the labeled pipe and fittings.

1303.7 Steel and stainless steel pipe.

Joints between steel or stainless steel pipe or fittings shall be threaded, press-connect or welded joints complying with Section 1303.3 or mechanical joints complying with Section 1303.7.1.

1303.7.1 Mechanical joints.

Joints shall be made with an approved elastomeric seal. Mechanical joints shall be installed in accordance with the manufacturer’s instructions. Mechanical joints shall be installed outdoors, underground, unless otherwise approved.

1303.8 Steel and stainless steel tubing.

Joints between steel or stainless steel tubing or fittings shall be mechanical, press-connect or welded joints complying with Section 1303.3.

1303.9 Piping protection.

Proper allowance shall be made for expansion, contraction, jarring and vibration. Piping other than tubing, connected to underground tanks, except straight fill lines and test wells, shall be provided with flexible connectors, or otherwise arranged to permit the tanks to settle without impairing the tightness of the piping connections.

Section 1304 Piping Support

1304.1 General.

Pipe supports shall be in accordance with Section 305.

Section 1305 Fuel Oil System Installation

1305.1 Size.

The fuel oil system shall be sized for the maximum capacity of fuel oil required. The minimum size of a supply line shall be 3/8-inch (9.5 mm) inside diameter nominal pipe or 3/8-inch (9.5 mm) outside diameter tubing. The minimum size of a return line shall be 1/4-inch (6.4 mm) inside diameter nominal pipe or 5/16-inch (7.9 mm) outside diameter tubing. Copper tubing shall have 0.035-inch (0.9 mm) nominal and 0.032-inch (0.8 mm) minimum wall thickness.

1305.2 Protection of pipe, equipment and appliances.

Fuel oil pipe, equipment and appliances shall be protected from physical damage.

1305.2.1 Flood hazard.

Fuel oil pipe, equipment and appliances located in flood hazard areas shall be located above the elevation required by Section 1612 of the International Building Code for utilities and attendant equipment or shall be capable of resisting hydrostatic and hydrodynamic loads and stresses, including the effects of buoyancy, during the occurrence of flooding up to such elevation.

1305.3 Supply piping.

Supply piping shall connect to the top of the fuel oil tank. Fuel oil shall be supplied by a transfer pump or automatic pump or by other approved means.

Exception: This section shall not apply to inside or above-ground fuel oil tanks.

1305.4 Return piping.

Return piping shall connect to the top of the fuel oil tank. Valves shall not be installed on return piping.

1305.5 System pressure.

The system shall be designed for the maximum pressure required by the fuel-oil-burning appliance. Air or other gases shall not be used to pressurize tanks.

1305.6 Fill piping.

A fill pipe shall terminate outside of a building at a point not less than 2 feet (610 mm) from any building opening at the same or lower level. A fill pipe shall terminate in a manner designed to minimize spilling when the filling hose is disconnected. Fill opening shall be equipped with a tight metal cover designed to discourage tampering.

1305.7 Vent piping.

Liquid fuel vent pipes shall terminate outside of buildings at a point not less than 2 feet (610 mm) measured vertically or horizontally from any building opening. Outer ends of vent pipes shall terminate in a weatherproof vent cap or fitting or be provided with a weatherproof hood. Vent caps shall have a minimum free open area equal to the cross-sectional area of the vent pipe and shall not employ screens finer than No. 4 mesh. Vent pipes shall terminate sufficiently above the ground to avoid being obstructed with snow or ice. Vent pipes from tanks containing heaters shall be extended to a location where oil vapors discharging from the vent will be readily diffused. If the static head with a vent pipe filled with oil exceeds 10 pounds per square inch (psi) (69 kPa), the tank shall be designed for the maximum static head that will be imposed.

Liquid fuel vent pipes shall not be cross connected with fill pipes, lines from burners or overflow lines from auxiliary tanks.

Section 1306 Oil Gauging

1306.1 Level indication.

Tanks in which a constant oil level is not maintained by an automatic pump shall be equipped with a method of determining the oil level.

1306.2 Test wells.

Test wells shall not be installed inside buildings. For outdoor service, test wells shall be equipped with a tight metal cover designed to discourage tampering.

1306.3 Inside tanks.

The gauging of inside tanks by means of measuring sticks shall not be permitted. An inside tank provided with fill and vent pipes shall be provided with a device to indicate either visually or audibly at the fill point when the oil in the tank has reached a predetermined safe level.

1306.4 Gauging devices.

Gauging devices such as liquid level indicators or signals shall be designed and installed so that oil vapor will not be discharged into a building from the liquid fuel supply system. Liquid-level indicating gauges shall comply with UL 180.

1306.5 Gauge glass.

A tank used in connection with any oil burner shall not be equipped with a glass gauge or any gauge that, when broken, will permit the escape of oil from the tank.

Section 1307 Fuel Oil Valves

1307.1 Building shutoff.

A shutoff valve shall be installed on the fuel oil supply line at the entrance to the building. Inside or above-ground tanks are permitted to have valves installed at the tank. The valve shall be capable of stopping the flow of fuel oil to the building or to the appliance served where the valve is installed at a tank inside the building. Valves shall comply with UL 842.

1307.2 Appliance shutoff.

A shutoff valve shall be installed at the connection to each appliance where more than one fuel-oil-burning appliance is installed.

1307.3 Pump relief valve.

A relief valve shall be installed on the pump discharge line where a valve is located downstream of the pump and the pump is capable of exceeding the pressure limitations of the fuel oil system.

1307.4 Fuel-oil heater relief valve.

A relief valve shall be installed on the discharge line of fuel-oil-heating appliances.

1307.5 Relief valve operation.

The relief valve shall discharge fuel oil when the pressure exceeds the limitations of the system. The discharge line shall connect to the fuel oil tank.

Section 1308 Testing

1308.1 Testing required.

Fuel oil piping shall be tested in accordance with NFPA 31.

Source and transcript record

Record Georgia · 2024 IMC · Chapter 13 Fuel Oil Piping and Storage

Effective January 1, 2026 · source captured Aug 30, 2026

Transcript SHA-256 f5100c9cc5263c214fa7655159ad60192e1f483b139fe322d1780cffacd1c3ae · text SHA-256 ce2d9f004ed7852bfecafd14eb9b53b75640611a5036f8b8a252d7128c0de564

Adoption authority · Official amendments · ICC chapter source