Appendix B Recommended permit fee schedule
Section B101 Mechanical Work, Other Than Gas Piping Systems
B101.1 Initial fee.
For issuing each permit $___.
B101.2 Additional fees.
Where applicable, additional fees shall be in accordance with Sections B101.2.1 through B101.2.3.
B101.2.1 Mechanical systems.
Fee for inspecting heating, ventilating, ductwork, air-conditioning, exhaust, venting, combustion air, pressure vessel, solar, fuel oil and refrigeration systems and appliance installations shall be $___ for the first $1,000.00, or fraction thereof, of valuation of the installation plus $___ for each additional $1,000.00 or fraction thereof.
B101.2.2 Repairs, alterations and additions.
Fee for inspecting repairs, alterations and additions to an existing system shall be $___ plus $___ for each $1,000.00 or fraction thereof.
B101.2.3 Boilers.
Fee for inspecting boilers (based upon Btu input):
$_____ | 33,000 Btu (1 bhp) to 165,000 (5 bhp) |
$_____ | 165,001 Btu (5 bhp) to 330,000 (10 bhp) |
$_____ | 330,001 Btu (10 bhp) to 1,165,000 (52 bhp) |
$_____ | 1,165,001 Btu (52 bhp) to 3,300,000 (98 bhp) |
$_____ | Over 3,300,000 Btu (98 bhp) |
For SI: 1 British thermal unit = 0.2931 W, 1 bhp = 33,475 Btu/h.
Section B102 Fee for Reinspection
B102.1 General.
If it becomes necessary to make a reinspection of a heating, ventilation, air-conditioning or refrigeration system, or boiler installation, the installer of such equipment shall pay a reinspection fee of $___.
Section B103 Temporary Operation Inspection Fee
B103.1 General.
When preliminary inspection is requested for purposes of permitting temporary operation of a heating, ventilating, refrigeration, or air-conditioning system, or portion thereof, a fee of $___ shall be paid by the contractor requesting such preliminary inspection. If the system is not approved for temporary operation on the first preliminary inspection, the usual reinspection fee shall be charged for each subsequent preliminary inspection for such purpose.